Ivaco Rolling Mills Rolling Schedule
Millimeters/Decimal (Fractional Inches)

4.75 mm .1875 " 3/16

Jan 22 - 04E
Feb 19 - 09E
Mar 20 - 14E

5.50 mm .216 " 7/32

Jan 21 - 04D
Feb 2 - 06C
Feb 18 - 09D
Mar 2 - 11C
Mar 20 - 14D

6.00 mm .234 " 15/64

Jan 19 - 04C
Jan 31 - 06B
Feb 17 - 09C
Feb 28 - 11B
Mar 18 - 14C

6.50 mm .256 " 1/4

Jan 24 - 04B
Jan 30 - 06A
Feb 16 - 09B
Feb 27 - 11A
Mar 17 - 14B

7.00 mm .276 " 9/32

Jan 24 - 04A
Feb 15 - 09A
Mar 16 - 14A

7.50 mm .297 " 19/64

Jan 24 - 03F
Jan 30 - 06I
Feb 14 - 08E
Mar 16 - 13F

8.00 mm .315 " 5/16

Jan 23 - 03E
Feb 13 - 08D
Mar 14 - 13E

8.30 mm .328 " 21/64

Jan 23 - 03D
Mar 12 - 13D

8.50 mm .335 " 11/32

Jan 23 - 03C
Feb 12 - 08C
Mar 12 - 13C

9.00 mm .354 " 23/64

Feb 11 - 08B
Mar 11 - 13B

9.50 mm .374 " 3/8

Jan 22 - 03A
Feb 10 - 08A
Mar 10 - 13A

10.00 mm .394 " 25/64

Jan 22 - 02J
Feb 9 - 07J
Mar 9 - 12J

10.30 mm .406 " 13/32

Feb 8 - 07I
Mar 8 - 12I

10.50 mm .414 " 13/32

Feb 7 - 07H
Mar 8 - 12H

11.00 mm .433 " 7/16

Jan 22 - 02G
Feb 7 - 07G
Mar 7 - 12G

11.30 mm .445 " #10M

Feb 6 - 07R

11.50 mm .453 " 29/64

Feb 6 - 07F
Mar 6 - 12F

12.00 mm .472 " 15/32

Feb 5 - 07E
Mar 6 - 12E

12.50 mm .493 " 31/64

Feb 5 - 07D
Mar 5 - 12D

13.00 mm .512 " 33/64

Feb 4 - 07C
Mar 4 - 12C

13.50 mm .531 " 17/32

Feb 3 - 07B
Mar 3 - 12B

14.30 mm .562 " 9/16

Feb 2 - 07A
Mar 2 - 12A

14.70 mm .578 " 37/64

Jan 29 - 05M
Feb 27 - 10L
Mar 28 - 15M

15.00 mm .593 " 19/32

Jan 29 - 05L
Feb 26 - 10K
Mar 27 - 15L

15.90 mm .625 " 5/8

Jan 29 - 05K
Feb 25 - 10J
Mar 27 - 15K

16.10 mm .629 " #15M

Feb 25 - 10R

16.50 mm .650 " 21/32

Jan 25 - 05A
Feb 20 - 10A
Mar 21 - 15A

17.50 mm .689 " 11/16

Jan 28 - 05J
Feb 25 - 10I
Mar 26 - 15J

18.25 mm .718 " 23/32

Jan 28 - 05I
Feb 24 - 10H
Mar 26 - 15I

19.50 mm .768 " 49/64

Jan 26 - 05C
Feb 20 - 10B
Mar 22 - 15C

20.25 mm .797 " 51/64

Jan 25 - 05B
Mar 21 - 15B

21.00 mm .828 " 53/64

Jan 27 - 05G
Feb 23 - 10F
Mar 25 - 15G

21.50 mm .844 " 27/32

Jan 27 - 05H
Feb 24 - 10G
Mar 25 - 15H

23.00 mm .906 " 29/32

Jan 27 - 05F
Feb 23 - 10E
Mar 25 - 15F

23.80 mm .937 " 15/16

Jan 27 - 05E
Feb 22 - 10D
Mar 23 - 15E

24.2 mm .953 " 61/64

Feb 21 - 10S

25.5 mm 1.00 " 1/1

Jan 26 - 05D
Feb 20 - 10C
Mar 22 - 15D

Rolling dates are approximate and indicate the planned end of rolling.
Delivery could be up to two weeks after the actual rolling.
4.75 mm requires minimum of 750 tons to justify rolling.
All other diameters require minimum of 600 tons.

This page was last revised on 2018-01-20 00:01:06