Ivaco Rolling Mills Rolling Schedule
Millimeters/Decimal (Fractional Inches)

4.75 mm .1875 " 3/16

Jul 18 - 31K
Aug 27 - 36E

5.50 mm .216 " 7/32

Jun 25 - 29D
Jul 17 - 31J
Jul 28 - 33D
Aug 27 - 36D
Sep 5 - 38D

6.00 mm .234 " 15/64

Jun 24 - 29C
Jul 16 - 31I
Jul 27 - 33C
Aug 12 - 36C
Sep 4 - 38C

6.50 mm .256 " 1/4

Jun 24 - 29B
Jul 15 - 31H
Jul 26 - 33B
Aug 11 - 36B
Sep 3 - 38B

7.00 mm .276 " 9/32

Jun 23 - 29A
Jul 15 - 31G
Jul 25 - 33A
Aug 10 - 36A
Sep 2 - 38A

7.50 mm .297 " 19/64

Jul 14 - 31F
Aug 10 - 35E

8.00 mm .315 " 5/16

Jul 12 - 31E
Aug 8 - 35D
Sep 13 - 40E

8.30 mm .328 " 21/64

Jun 23 - 28K
Jul 11 - 31D
Sep 13 - 40D

8.50 mm .335 " 11/32

Jul 11 - 31C
Aug 7 - 35C
Sep 12 - 40C

9.00 mm .354 " 23/64

Jul 10 - 31B
Aug 6 - 35B
Sep 12 - 40B

9.50 mm .374 " 3/8

Jul 10 - 31A
Aug 6 - 35A
Sep 11 - 40A

10.00 mm .394 " 25/64

Jul 9 - 30J
Aug 5 - 34J
Sep 10 - 39I

10.30 mm .406 " 13/32

Jun 29 - 30I
Aug 3 - 34I
Sep 9 - 39H

10.50 mm .414 " 13/32

Jun 29 - 30H
Aug 3 - 34H
Sep 9 - 39G

11.00 mm .433 " 7/16

Jun 29 - 30G
Aug 2 - 34G
Sep 9 - 39F

11.50 mm .453 " 29/64

Jun 29 - 30F
Aug 2 - 34F
Sep 8 - 39E

12.00 mm .472 " 15/32

Jun 28 - 30E
Aug 1 - 34E
Sep 8 - 39J

12.50 mm .493 " 31/64

Jun 27 - 30D
Aug 1 - 34D
Sep 7 - 39D

13.00 mm .512 " 33/64

Jun 27 - 30C
Jul 30 - 34C
Sep 6 - 39C

13.50 mm .531 " 17/32

Jun 26 - 30B
Jul 30 - 34B
Sep 6 - 39B

14.30 mm .562 " 9/16

Jun 26 - 30A
Jul 29 - 34A
Sep 5 - 39A

14.70 mm .578 " 37/64

Jun 23 - 28J
Jul 25 - 32J
Sep 2 - 37L

15.00 mm .593 " 19/32

Jun 22 - 28I
Jul 25 - 32I
Sep 2 - 37K

15.90 mm .625 " 5/8

Jun 22 - 28H
Jul 24 - 32H
Sep 1 - 37J

16.50 mm .650 " 21/32

Jul 19 - 32A
Aug 28 - 37A

17.50 mm .689 " 11/16

Jun 22 - 28G
Jul 24 - 32G
Sep 1 - 37I

18.25 mm .718 " 23/32

Jun 21 - 28F
Jul 23 - 32F
Aug 31 - 37H

19.50 mm .768 " 49/64

Jul 9 - 30K
Jul 20 - 32C
Aug 28 - 37B

20.25 mm .797 " 51/64

Jul 20 - 32B

21.00 mm .828 " 53/64

Jun 21 - 28D
Jul 23 - 32M
Aug 30 - 37F

21.50 mm .844 " 27/32

Jun 21 - 28E
Jul 23 - 32L
Aug 31 - 37G

23.00 mm .906 " 29/32

Jul 22 - 32K
Aug 30 - 37E

23.80 mm .937 " 15/16

Jul 22 - 32E
Aug 29 - 37D

25.5 mm 1.00 " 1/1

Jul 21 - 32D
Aug 28 - 37C

Rolling dates are approximate and indicate the planned end of rolling.
Delivery could be up to two weeks after the actual rolling.
4.75 mm requires minimum of 750 tons to justify rolling.
All other diameters require minimum of 600 tons.

This page was last revised on 2017-06-23 00:01:02